West Covina, CA
Get your West Covina roof looked at properly
An inspection is the cheapest thing on this site and the one that saves the most money, because it turns a guess into a number.
Describe the inspection job
Three questions, then the address. Up to three West Covina contractors who do this work.
You are on the list.
No provider in West Covina is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a inspection job. A contractor who has not raised them has not looked properly.
- Whether the fee comes off the job if you proceed
- Whether the inspection includes going into the attic
- Photographs of anything they flag
- An estimated number of years left in the covering
- A written report, not a verbal summary
A thorough look covers the covering, the flashings, the penetrations, the gutters, the ventilation and the attic side of the deck. If nobody went into the attic, half the inspection did not happen.
Either way, ask for photographs. A report with pictures of your actual roof is worth ten times one with a tick-box condition rating.
The point of an inspection is not to find a disaster. It is to find the two hundred dollar problem before it becomes a twelve thousand dollar one.
Locally
Behind it: wind-blown embers landing in the valleys. Class A assemblies and closed-off vents matter more here than the colour of the shingle.
About inspection here
Is this really free?
It is free to you. Contractors pay to receive homeowner requests in their area. That is the entire business model, and we would rather say so plainly than pretend otherwise.
How long does a re-roof take?
A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.
Are gutters included in a re-roof?
Usually not, unless the quote says so. If they are near the end of their life, replacing them during the re-roof is meaningfully cheaper than doing it later, because the crew and the staging are already there.
What if the decking is rotten underneath?
Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.
Start with a free estimate
Free, no obligation, and your details go to no company until you say yes.
